• sri lanka
  • shanghai
  • data
A00
  • sri lanka
  • shanghai
  • data

TRI top 5

Site visit to TRI site. Landscaping is almost finished and starts to give the real sense of the space and how all the buildings relate and revolve around the heart of the site: The Tree + Tower. Completion date is coming soon... towards soft opening ... cannot wait. 

The Banyan Tree and the Tower

The Banyan Tree and the Tower

Main house with the infiniti pool almost finished. Columns getting clad in reclaimed wood.

Main house with the infiniti pool almost finished. Columns getting clad in reclaimed wood.

Yoga Shala and Library waiting for the final painting. 

Yoga Shala and Library waiting for the final painting. 

Sample Washroom finished in Suite 8

Sample Washroom finished in Suite 8

The profile of Suite 6, looking sexy.

The profile of Suite 6, looking sexy.


This is the detail they use in Sri Lanka for the terrazzo strips: Glass instead of Brass.  

Glass Strips waiting to be used

Glass Strips waiting to be used

It gets laid directly into the concrete underlay. The terrazzo will then be poured and everything sanded smooth.

It gets laid directly into the concrete underlay. The terrazzo will then be poured and everything sanded smooth.

tags: Construction, TRI, Sri Lanka, Hotel
Saturday 07.25.15
Posted by Sacha
Comments: 1